How the Kanban System Works in Manufacturing

While there is a shortage of necessary parts, there is an abundance of other parts. The Kanban system is a mechanism to reduce overproduction and shortages by matching what is used by the next process with what the previous process needs to replenish.
This article explains the Kanban system in manufacturing, including its mechanism, the process of taking and replenishing cards, how to calculate the number of cards, and points to note when implementing it, using the assembly of automotive parts as an example.
- What is the Kanban system? It connects usage and replenishment through information.
- Difference from Just-In-Time
- The process for picking up and replenishing stock during unit assembly.
- How to calculate the number of Kanban cards and points to note
- Calculation example: 100 pieces/hour, refilling 30 minutes, 20 pieces per container
- Align the units and the range of supplementation time.
- Simply reducing the number of sheets is not an improvement.
- Three points to check during implementation and review
- Match the Kanban display with the actual operation.
- Summary: Kanban should match items with replenishment instructions.
- Ollo Factory is a manufacturing-specific AI for analyzing work variability and waiting times.
- Watch Ollo Factory’s Work Analysis in Action
What is the Kanban system? It connects usage and replenishment through information.
The Kanban system is a method of communicating information such as part number, quantity, and location so that the next process can pick up the parts it needs and the previous process can replenish what has been used. It is also written as "Kanban system."
The Kanban system is part of the Toyota Production System. For more information on the Toyota Production System, please also refer to " What is the Toyota Production System? Its two pillars and how to implement on-site improvements ."
In addition to attaching cards to containers, there are also methods of exchanging information electronically. What's important is not the medium, but that the movement of goods and replenishment instructions correspond.
kinds | Main things to convey | Example of unit assembly |
|---|---|---|
Pickup sign | Which parts, from where, and in what quantities? | The assembly process retrieves the parts containers from the storage area. |
Kanban (production instruction kanban) | What to produce and how much to replenish | The process produces the parts that were taken over by the previous process. |
Names and procedures vary from site to site. Even if the necessary information is written on the card, if the rules for collection and replenishment are not followed, the inventory and instructions will not match.
Difference from Just-In-Time
Just-in-time is the concept of producing and delivering only what is needed, when it is needed, and in the required quantity. The Kanban system is one of the information transmission mechanisms that supports the implementation of this system.
Even with the introduction of Kanban, if the quality and capacity of the preceding process are not stable, replenishment cannot be performed at the necessary time. We will also improve variability in setup, transportation, and work time.
Furthermore, its purpose differs from "Kanban," a task management system used in software development and other applications. This article focuses on parts, containers, and replenishment instructions in a factory setting.
Regarding Just-In-Time (JIT), please also review "What is JIT?", its three principles, and the conditions for its implementation in factories .
The process for picking up and replenishing stock during unit assembly.
Let's take an assembly process using a container with 20 parts of part A as an example. The following is a hypothetical operation to illustrate the flow.
scene | Movement of goods and information | Things to decide |
|---|---|---|
Use parts in assembly | Collect the kanban according to the agreed-upon conditions. | Collection conditions such as when the container is empty or when it is first used. |
Take back the parts | Transport the containers of the corresponding part number and quantity to the designated location. | Pickup location, quantity, shipping method, person in charge |
Replenish in the previous step | Based on the pickup information, we will produce the required amount and return it. | Production instructions and completion, container and Kanban system management. |
This example assumes a system where cards are collected when the container is empty. If you adopt this system on-site, please check if you can refill the card while using the next container. The same collection conditions may not be suitable for all factories.
When switching product numbers, ensure that old product cards and remaining stock do not get mixed in. If production is increased without cards due to an anomaly, a method is needed to restore normal inventory and instruction correspondence.
How to calculate the number of Kanban cards and points to note
Under conditions where demand rate and replenishment lead time are stable, the following formula may be used to consider the number of containers and kanban cards.
Required number of units for consideration = Average demand × Replenishment lead time × (1 + safety factor) ÷ Quantity per container
Decimals are rounded up. This explanation assumes one sheet per container and is not a formula that can be directly applied to all operations.
Calculation example: 100 pieces/hour, refilling 30 minutes, 20 pieces per container
We assume an average demand of 100 units/hour, a replenishment lead time of 0.5 hours, a safety factor of 0.2, and a quantity of 20 units per container.
100 × 0.5 × (1 + 0.2) ÷ 20 = 3 pieces. The quantity considered, including the current demand and a safety margin, is 60 units. This number is a condition used to explain the calculation method.
A 20% safety factor is not a recommended value. It should be determined based on actual demand fluctuations, replenishment delays, and the impact of stockouts, and confirmed through trials.
Align the units and the range of supplementation time.
If you enter the average demand as "units/hour," you should also enter the replenishment lead time as "hours." Entering the value directly in minutes will significantly alter the results.
Replenishment time should be measured in accordance with actual operations, including not only manufacturing time but also card collection, transportation, waiting, production, and return. Please check not only the average but also the conditions that cause delays.
Simply reducing the number of sheets is not an improvement.
Even if reducing the number of items ordered lowers inventory, an increase in stockouts and emergency deliveries will destabilize the workflow. Before changing the number of items ordered, investigate whether it's possible to improve replenishment time and reduce variability in the work process.
The explanation of production methods in J-Net21 by the Organization for Small & Medium Enterprises and Regional Innovation , Japan, is also a useful reference for understanding the concepts of TPS and lean manufacturing. It involves reviewing not only inventory but also the workflow and workload on the factory floor.
Three points to check during implementation and review
Correspondence: Do the product number, container quantity, storage location, and Kanban card match?
Refill stability: Can the required amount be replenished within the required time?
Operation during abnormal situations: Who will make decisions in the event of shortages, defects, loss, or part number changes?
Determine the target product numbers and time period, and record the amount of work-in-progress, the number of times items were out of stock, the replenishment time, and the burden of emergency response. After any changes, check under the same conditions and adjust the number of records and rules to suit what can be used on-site.
When investigating delays in replenishment, you can also check work times and downtime using video. Ollo Factory's analysis features are described in the product documentation.
Match the Kanban display with the actual operation.
The card should include information necessary for on-site identification and replenishment, such as product number, product name, quantity per container, collection location, replenishment source, and management number. If you have an existing company format, please use that format.
Do the product numbers and quantities on the actual product, container, and card match?
Is it decided when the cards will be collected and who will deliver them where?
When switching part numbers or in case of malfunctions, are old cards or temporary instructions left behind?
In addition to tidying up the displays, we also repeatedly check by actually picking up and replenishing stock. If there are issues such as cards not being returned, excess stock, or shortages, we review not only the number of cards but also the replenishment time and operations.
Summary: Kanban should match items with replenishment instructions.
The information regarding pickup and replenishment should be linked to product number, container, and location.
The number of items should be considered in conjunction with demand and actual replenishment time.
We will also measure stock shortages and emergency responses, and continuously review the number of items and operations.
If delays in replenishment are due to variations in the work time or waiting time in the preceding process, one method is to use video analysis AI to investigate the actual work situation.
Ollo Factory is a manufacturing-specific AI for analyzing work variability and waiting times.
Ollo Factory uses AI to analyze work videos and provides support from training to improvement.
The AI-powered operational analysis system classifies work videos, allowing you to check for variations in timing and differences in movement. It can be used to investigate the causes of inconsistent work in previous processes and to consider improvements to layout and procedures. While it's not a system for issuing Kanban cards or managing inventory replenishment, it can be used to identify waste before and after implementing a Kanban system.

Demo screen from the Ollo Factory official website.
Ollo Factory provides comprehensive on-site training and improvement services, from creating video manuals to comparing and optimizing work processes.
If you are considering implementing the Kanban system , please refer to the Ollo Factory documentation.
Request information from Ollo Factory.
Watch Ollo Factory’s Work Analysis in Action
About the author
K.Y. | Business Development Lead & Marketing, Ollo Inc.
K.Y. leads business development and marketing at Ollo Inc., an AI startup originating from the Matsuo Laboratory at the University of Tokyo and the developer of Ollo Factory, a work analysis AI for manufacturing.
After studying engineering and design at university, K.Y. joined a major automaker and worked on new electric-vehicle development, from design through factory production, including hands-on assembly-line training. K.Y. later worked in sales and marketing at a manufacturing startup.
Today, K.Y. helps manufacturing teams use AI to improve the way they work through Ollo Factory.
Back to articles
Related articles
See how Ollo Factory can support your factory
Book a demo
• See the product in action
• Discuss your production needs
• Explore available plans
Book a demo

Request a brochure
• Customer stories
• Key features
• How to get started