7 Wastes of Lean Manufacturing: Examples and How to Find Them

    7 Wastes of Lean Manufacturing: Examples and How to Find Them

    The seven wastes of lean manufacturing are overproduction, inventory, transportation, overprocessing, motion, waiting and defects. They provide a way to examine how work and material flow use time and resources without assuming that every non-assembly action is unnecessary.

    This guide uses automotive component unit assembly to explain each waste, how to distinguish similar categories and how to turn an observation into a testable improvement. The examples are fictional.

    The seven wastes with manufacturing examples

    Waste

    What to investigate

    Unit-assembly example

    Overproduction

    Producing before or beyond the requirement

    Assembling 50 units when the downstream requirement is 30

    Inventory

    Material held without a justified quantity or timing

    Obsolete brackets occupying the component location

    Transportation

    Unnecessary movement of material

    Moving assembled units through an avoidable temporary storage point

    Overprocessing

    Work beyond the requirement

    Entering the same result into two records without a necessary purpose

    Motion

    Unnecessary movement by a person

    Searching for the fastening tool or repeatedly reorienting a part

    Waiting

    Being unable to advance the work

    Waiting for the test machine or upstream component supply

    Defects

    Rework, correction or scrap

    Removing and reinstalling a bracket fitted in the wrong orientation

    A single problem can create several wastes. Overproduction may fill the available space, increase handling and make defects harder to detect promptly. Follow the sequence of events rather than focusing only on the category name.

    How to find each waste on the shop floor

    Overproduction: check the actual requirement

    Compare the product, quantity and timing with the downstream requirement and the production signal. Equipment availability alone is not a reason to keep making units.

    Confirm the reason for any buffer before reducing it. Demand variation, setup constraints and replenishment lead time can justify defined stock. The question is whether the quantity and trigger are controlled, not whether every unit above 30 is automatically waste.

    Inventory: identify why it is there and how long it stays

    Record the part number, quantity, arrival time, next use and responsible person. Distinguish necessary replenishment stock from obsolete material, unidentified work in process or a quality hold.

    Do not dispose of a held part merely to clear space. Check its quality status, ownership and retention requirements before deciding what should happen to it.

    Transportation: follow the material

    Observe where a unit starts and finishes, how many times it is set down or transferred and why each stop exists. Short distances can still create repeated handling.

    An idea to move inspection closer to assembly must also account for supply routes, maintenance space and emergency access. Assigning transport to another person may change responsibility without reducing the total transport.

    Overprocessing: establish which requirement the work serves

    Check drawings, customer requirements and the downstream use of a record. Two similar checks may verify different conditions or provide necessary independent assurance.

    Discuss a duplicated record or inspection with the responsible quality team before removing it. Simplification should preserve the required function, traceability and approval.

    Motion: observe searching, reaching and repositioning

    Record the frequency and conditions of small repeated movements. A 12-second search can be connected to a label facing away from the operator, mixed parts or an unclear supply location.

    Investigate presentation and workstation design instead of demanding imitation of the fastest person. Check reaching, twisting and shoulder loading alongside elapsed time.

    Waiting: identify what prevents the next action

    Record the start and finish of a wait and what the operator was waiting for: the test result, a part, an instruction or an available fixture. These causes need different countermeasures.

    A machine’s automatic run does not always permit other work. Confirm monitoring and access conditions before changing the sequence. A standard work combination sheet can show timing and overlap, but the operating rules determine what is permissible.

    Defects: separate where the problem occurred from where it was found

    A reversed bracket discovered at final inspection may originate in part presentation or unclear orientation guidance earlier in the process. Record both the occurrence and detection points.

    Consider mistake prevention, clearer identification and interruption management as well as detection. After a change, examine defect count, rework time and downstream escapes, not only a shorter cycle.

    Motion vs. transportation, and inventory vs. overproduction

    Motion focuses on the person’s movement; transportation focuses on moving material. Searching for a trolley and transporting a unit are separate observations. Do not count the same seconds twice when aggregating categories.

    Overproduction is the act of making too early or too much; inventory is a state of material being held. Inventory can also arise from purchasing lot sizes, quality holds and other causes. A label is a starting point for investigation, not a complete diagnosis.

    Ollo Factory manufacturing work analysis AI: request a brochure with features and use cases

    Turn an observation into a verified improvement

    Keep facts, hypotheses and tests separate. For example:

    • Observed fact: retrieving a part took 20 seconds, including 12 seconds of searching.

    • Hypothesis: the part-number label is difficult to see from the working position.

    • Test: change the approved label orientation, then compare search time and picking errors under comparable conditions.

    Record the measurement scope, quantity and conditions before and after the change. Keep operators involved in explaining the work. A favorable trial should not be presented as a sustained result until the relevant period and criteria have been checked.

    Frequently asked questions

    Are inspections always waste?

    Inspection does not physically transform the product, but it may be necessary to meet quality and regulatory requirements. Preserve its required function while investigating how to prevent the defect upstream.

    Is unused employee talent an eighth waste?

    Many lean programs use an eighth category for unused skills or knowledge. The seven-waste framework discussed here remains useful; state which framework a team uses so classifications remain consistent.

    Related reading:

    Summary: observe the work before assigning the label

    • Use the seven categories to ask specific questions about work and flow.

    • Record measurable facts and avoid double-counting related observations.

    • Test countermeasures and verify quality, safety and sustained performance.

    AI can help locate candidate losses in work videos, giving reviewers a concrete sequence to examine with the people who perform the work.

    Find improvement opportunities in video with Ollo Factory

    Ollo Factory is a manufacturing-focused work analysis AI. It can analyze work video to identify potential losses and propose improvements, using perspectives such as the seven wastes, safety and ergonomics.

    Reviewers can connect a suggestion to the relevant scene, investigate the cause and compare the proposed method with the current one. Treat AI suggestions as candidates for validation against equipment, quality and safety requirements, then update training and instructions when an improved method is approved.

    Ollo Factory analysis showing detected issues and suggested improvements

    Product screen published on Ollo’s English website. It illustrates the feature, not the results of the fictional assembly example in this article. Explore Ollo Factory features.

    About the author

    K.Y. | Business Development Lead & Marketing, Ollo Inc.

    K.Y. leads business development and marketing at Ollo Inc., an AI startup originating from the Matsuo Laboratory at the University of Tokyo and the developer of Ollo Factory, a work analysis AI for manufacturing.
    After studying engineering and design at university, K.Y. joined a major automaker and worked on new electric-vehicle development, from design through factory production, including hands-on assembly-line training. K.Y. later worked in sales and marketing at a manufacturing startup.
    Today, K.Y. helps manufacturing teams use AI to improve the way they work through Ollo Factory.

    Back to articles

    See how Ollo Factory can support your factory

    Book a demo

    • See the product in action
    • Discuss your production needs
    • Explore available plans

    Book a demo

    Request a brochure

    • Customer stories
    • Key features
    • How to get started

    Ollo Factory English product brochure