Published: Nov 19, 2026

Training & Standardization

QC Process Chart vs. Work Instruction: What Is the Difference?

    QC Process Chart vs. Work Instruction: What Is the Difference?

    A QC process chart is a plan for quality control at each stage of the process, while a work procedure manual is a document that shows how to perform individual tasks. The former determines "what to control, and by what standards, methods, and frequency," while the latter communicates "how to perform the work and check it on-site."

    Even when dealing with the same contract terms, their roles differ. Revising only one of them may lead to discrepancies between on-site work and quality control plans. This article explains the content and appropriate use of updates, using the assembly of automotive parts as an example.

    Comparing the differences between QC process charts and work procedure manuals.

    Comparison items

    QC process chart

    Work procedure manual

    Main role

    Plan and share process quality control.

    Explain the work method and checks in detail.

    Target unit

    Multiple process flow and management of each process

    Procedures within a specific task or process

    Content to be included

    Quality characteristics, standards, methods, frequency, records, abnormality handling.

    Sequence, materials used, actions, points to note, completion check

    Main usage scenarios

    Review, inspect, and verify consistency when management methods are changed.

    Work execution, training, and method verification

    How to connect them

    Indicates the number and version of the related procedure manual.

    Correspond to management standards and reference documents.

    The name and scope of documents vary from company to company. Some companies combine certain items into work standards manuals, so do not judge the content based solely on the name; please check internal regulations and customer requirements.

    For information on how to create work procedure manuals and QC process charts, and for examples of how to fill them out, please also refer to: [Free Template] How to Create Work Procedure Manuals | Template with Photos and Examples , and [Free Template] How to Create QC Process Charts | Examples for Manufacturing .

    How do you differentiate between the same conditions when assembling a unit?

    The QC process chart should include a description of the management system.

    For fastening processes, you should organize the quality characteristics to be managed, the drawings and fastening specifications to be referenced, the management methods and measuring instruments to be used, the frequency of checks, the record destination, and the actions to be taken in case of abnormalities.

    For example, you would write something like, "The orientation and fastening conditions of the parts will be managed according to the approved specifications and designated methods." Specific numerical values ​​should be confirmed in the applicable drawings and specifications. Do not guess and enter general values; always confirm them in the applicable drawings and specifications.

    The work procedure manual should describe the actual operation and verification process.

    Even for the same process, the procedure manual will describe the placement of parts, setting them in the jig, using tools, and checking after fastening in a sequential manner. Position and orientation will be shown with photographs, and conditions that cannot be conveyed by photographs will be supplemented with text.

    Phrases like "tighten securely" can be interpreted differently by different workers. Therefore, approved fastening conditions, methods for confirming completion, and procedures for resuming after interruption should be provided along with references.

    Responses to abnormal situations should not be contradictory.

    If the QC process chart specifies stopping the flow and contacting the quality control department, but the procedure manual states that the process can be completed simply by the worker restarting the machine, then the response will be inconsistent.

    There's no need to copy the same long document to both. Alternatively, you can consolidate the details into a single management document and refer to it from the other. The key requirements are that you can quickly access the information needed on-site and identify the version of the referenced document.

    Which one should I start making?

    In a new process, the workflow, required quality, and control conditions are first defined, and then the work methods that meet them are specified. The QC process chart and procedure manual are created by manufacturing, quality, and production technology personnel, who compare and verify them together.

    If documentation is lacking in existing processes, do not simply transcribe the current work as the correct method. Compare the actual work with the approved conditions, and if there are any discrepancies, make a decision before standardizing.

    • If the method for quality control of the process has not been decided, first confirm the requirements and control conditions.

    • If management conditions are set but the work isn't being done consistently, then procedures and training need to be established.

    • If both exist but there is a discrepancy, ensure that the applicable conditions and versions are consistent.

    When making changes, review the QC process chart and procedure manual together.

    1. Identify the conditions to be changed and the scope of impact.

    When changing tools, we check not only the tool name but also whether it will affect fastening conditions, operation, recording, anomaly detection, and verification methods. The same applies to changes in parts, jigs, equipment, and inspections.

    Distinguishing between whether the product requirements change or whether only the implementation method to meet the same requirements changes makes it easier to identify documents that need review.

    2. Reflect this in both the management plan and the work methods.

    Example of changes

    Things to check in the QC process chart.

    Check the procedure manual.

    Change fastening tool

    Management methods, record keeping, and procedures in case of emergencies.

    Tools, how to hold, operation, completion confirmation

    Change the shape of the part

    Quality characteristics, standards, and verification methods

    Orientation, setting position, handling

    Change the testing method

    Method, measuring instrument, frequency, recording

    The order of tests, the results, and the response to abnormalities.

    There's no need to mechanically rewrite items whose conditions haven't changed. We'll document the results of our analysis of the changes and maintain consistency with the referenced data.

    3. Ensure that approval, effective date, and training are aligned.

    Even if the revised document is approved, operations will not change if the old version remains in use. The effective date will be aligned, and the postings, shared folders, and terminal references will be switched.

    Explain the reasons for the changes and the differences in the work process, and confirm that the users can perform them. After implementation, verify that the actual items, records, and work processes match the new conditions.

    When preparing procedure manuals while comparing them with approved management conditions, you can also create a draft from the video and output it to an existing Excel format.

    Points to note when using Excel templates

    The QC process chart distribution template is a format for organizing processes, quality characteristics, standards, methods, frequency, records, abnormality handling procedures, responsible persons, and related procedures. Do not use the sample text as is as control conditions.

    Procedure manual templates are used to show photos and explanations of the work in order. Instead of posting a QC process chart in place of procedure manuals, or relying solely on procedure manuals for overall process management planning, use them appropriately according to the role.

    Summary: Align management planning with implementation methods.

    • The QC process chart outlines the quality control plan, while the procedure manual shows the actual work methods.

    • We link management standards and abnormal procedures with references to prevent inconsistencies between documents.

    • When changes are made, we will confirm the impact of both documents, the effective date, and how to inform the relevant parties on-site.

    The task of organizing photos and explanations in procedure manuals from scratch can be streamlined with AI. Humans can review the management criteria, and drafts of work methods can be created from videos, reducing the burden of updates.

    Ollo Factory: An AI-powered work analysis tool that streamlines the creation of procedure manuals using existing formats.

    Ollo Factory uses AI to analyze work videos and supports everything from training to improvement. Among Ollo Factory's functions, the video manual AI and comparative analysis AI support everything from creating work procedure manuals to ensuring their implementation.

    Standardizing practical work with AI-powered video manuals

    The AI-powered video manual analyzes work procedures from videos and creates a draft of the procedure manual, including explanatory text. It also supports importing existing Excel procedure manual templates and downloading the analysis results in that format. After the procedure manual is generated, it is checked against the management conditions of the QC process chart for approval.

    Screenshot of the Ollo Factory features screen This is a demo screen from the official Ollo website. It does not represent the result of analyzing the process described in the main text.

    Standardized manuals are being implemented using comparative analysis AI.

    The comparative analysis AI allows you to compare two work videos, such as one of a model and one of a newcomer, to identify differences in the time and movements of individual tasks. You can examine the sections with differences in the video and consider points for instruction and practice. The video manual AI helps ensure the adoption of manuals created with the AI ​​and supports the thorough implementation of standard work procedures.

    Screenshot of the Ollo Factory features screen This is a demo screen from the official Ollo website. It does not represent the result of analyzing the process described in the main text.

    Please note that Ollo Factory does not have a function to automatically determine the management standards or inspection frequency of the QC process chart.

    If you are interested in standardization after creating a QC process chart or training after creating a procedure manual , please refer to the Ollo Factory materials.

    Request information from Ollo Factory.

    Watch Ollo Factory’s Video Manual AI in Action

    About the author

    K.Y. | Business Development Lead & Marketing, Ollo Inc.

    K.Y. leads business development and marketing at Ollo Inc., an AI startup originating from the Matsuo Laboratory at the University of Tokyo and the developer of Ollo Factory, a work analysis AI for manufacturing.
    After studying engineering and design at university, K.Y. joined a major automaker and worked on new electric-vehicle development, from design through factory production, including hands-on assembly-line training. K.Y. later worked in sales and marketing at a manufacturing startup.
    Today, K.Y. helps manufacturing teams use AI to improve the way they work through Ollo Factory.

    Back to articles

    Related articles

      See how Ollo Factory can support your factory

      Book a demo

      • See the product in action
      • Discuss your production needs
      • Explore available plans

      Book a demo

      Request a brochure

      • Customer stories
      • Key features
      • How to get started

      Ollo Factory English product brochure