How to Calculate Standard Time in Manufacturing

    How to Calculate Standard Time in Manufacturing

    Standard time is a defined value that includes the net time corresponding to a set condition and method, plus the necessary buffer time.

    This article explains the procedure and formula for setting standard time using the example of automobile component unit assembly, particularly with a net time of 60 seconds.

    Difference between observation time, net time, and standard time

    Terminology

    Meaning in this article

    Judgmental considerations

    Net time

    Basic time that matches the standard condition and work pace

    Do not treat simple average as the standard

    Buffer time

    Time to be added as necessary

    Clarify the target, basis, and denominator for calculation

    Standard time

    Time set by reflecting net time and buffer time

    Leave method, condition, and version

    Buffer time is the time needed to continue work, such as for recovery from fatigue or irregular accompanying tasks.JEED and the University of Occupational and Environmental Development: "Creation of Standard Time and Work Quantity Planning"The concepts of net time, buffer time, and work analysis are organized here.

    Five steps to set standard time

    Below, the five-step process from determining target conditions to measurement, calculation, and approval is explained. The correction coefficient and buffer rate should be determined according to the field setting standards.

    1. Fix target conditions and work methods

    Before measuring standard time, establish the following conditions.

    • Product and work conditions:Part number, component arrangement, jig, tools, inspection method

    • Personnel conditions:Number of personnel and skill and implementation conditions required for the task

    • Measurement range:From the start of jig setup to retrieving the inspection result

    Averaging different cycles together can make it difficult to determine which task to apply the standard to.

    2. Divide elements and measure multiple times

    Divide sets, fastening, inspection confirmation, and retrieval. In addition to normal repetition, record when tool exchange or material replenishment occurs. Leave the cause of abnormal cycles and do not delete them silently.

    3. Determine net time

    There are methods for setting net time that involve time study with work pace evaluation or using established time data.

    4. Calculate standard time considering buffer time

    In this article, the buffer rate is defined as "buffer time ÷ net time". Once the buffer rate is known, standard time can be expressed as follows:

    Standard time = Net time × (1 + buffer rate)

    Also, if buffer time is known, standard time can be calculated as follows, even if buffer rate is not known:

    Standard time = Net time + Buffer time

    5. Compare the set value with actual work and approve

    Confirm whether the necessary checks can be completed without interruption and whether the included buffer is not also included in other estimation items. The process manager approves the adopted value and application conditions, and re-evaluates when the configuration, equipment, or variety changes.

    Calculation example for a net time of 60 seconds

    Next, a calculation example with a net time of 60 seconds. Assume the work pace has been adjusted. Include cases where a margin is used and where the margin is known. These figures do not represent actual values or implementation effects.

    Conditions

    Calculation

    Standard time

    10% margin

    60×(1+0.1)

    66 seconds

    6 seconds of margin

    60+6

    66 seconds

    Actual data used for standard time evaluation can also be gathered and compared using Video Manual AI. The calculation rules and margin judgments follow the standards established on-site.

    Three things often overlooked in calculations

    Simultaneous human and machine work

    When preparing the next component during automatic inspection, adding human work time and machine time together can double the cycle count. First determine whether you want to find the number of human units or the repeating time of the equipment, then verify overlaps on the time axis.

    Dual counting of auxiliary work, anomalies, and margins

    If the material supply time is allocated individually to the net time, adding the same supply to the margin time results in double counting. Sudden stops should not be processed uniformly with a standard margin rate; separate the standard time scope and the causes of improvement.

    Confusion between standard time and takt time

    Standard time is a setting for the work side. Takt time is the production time available for the period ÷ required production quantity. A mechanical shortening of the standard time method when demand changes is not possible.

    Frequently asked questions

    What percentage should the margin be?

    A uniform optimal value cannot be shown. The margin is set based on fatigue, auxiliary work, on-site conditions, company standards, and measurement results. Keep the adoption rate, target work, and basis for setting.

    Can AI measure the work time directly as standard time?

    Measurement results are the basis for setting. Verify classification corrections, normal vs. abnormal distinction, work methods, rating, and margin handling, and the responsible person must adopt it as standard.

    Summary: Align the definitions of net time and margin rate

    • Distinguish margin time, net time, and standard time, and define target conditions and work methods

    • Leave the basis for calculations and re-evaluate standard time when methods or equipment change

    AI can streamline the organization of work data for standard time setting. Automate element work division, time aggregation, and cycle comparison, allowing the responsible person to focus on condition confirmation and standard setting.

    "Ollo Factory", a manufacturing-specific work analysis AI that automates time aggregation and comparison for standard time evaluation

    ① Organize observation time for elements

    Video can confirm element work and time for classification. Align where to measure from to where, using the video, and prepare materials for consistent handling of auxiliary work and anomalies.

    Screen showing work time and count aggregated by element work in Ollo Factory

    Official demo screen of Ollo Factory. This is a different task from the unit assembly example in the text.

    ② Check cycles and differences among operators

    Compare the same work and confirm time differences per element. Do not attribute differences solely to work pace; use them to investigate methods, equipment, and material supply conditions.

    Screen showing video sequence of same work area in Ollo Factory for comparing operation and time difference.

    Official demo screen of Ollo Factory. This is a separate task from the unit assembly example in the text.

    Automatically measured time is an observation value. A separate judgment is required to determine net time, rating, and denominator/rate for margin, and to approve it as standard.

    Watch Ollo Factory’s Work Comparison AI in Action

    About the author

    K.Y. | Business Development Lead & Marketing, Ollo Inc.

    K.Y. leads business development and marketing at Ollo Inc., an AI startup originating from the Matsuo Laboratory at the University of Tokyo and the developer of Ollo Factory, a work analysis AI for manufacturing.
    After studying engineering and design at university, K.Y. joined a major automaker and worked on new electric-vehicle development, from design through factory production, including hands-on assembly-line training. K.Y. later worked in sales and marketing at a manufacturing startup.
    Today, K.Y. helps manufacturing teams use AI to improve the way they work through Ollo Factory.

    Back to articles

    Related articles

      See how Ollo Factory can support your factory

      Book a demo

      • See the product in action
      • Discuss your production needs
      • Explore available plans

      Book a demo

      Request a brochure

      • Customer stories
      • Key features
      • How to get started

      Ollo Factory English product brochure